New Benches
Two new benches have been installed around 7 islands pond, replacing old benches.
Another bench has been removed because it was coming to the end of its safe life span.

Two new benches have been installed around 7 islands pond, replacing old benches.
Another bench has been removed because it was coming to the end of its safe life span.

Before the end of March 2026 the following tree works will be carried out:
A new interpretation board all about acid grassland restoration has been installed on the 7 islands site to the north of the pond.
Last Summer SGN undertook gas mains replacement works on the Common. Some of the required reinstatement was delay until this Spring. Towards the end of April the following works will be carried out on the land parcels shown on the attached map. Parcel A: Replace footpath and damaged signage. Re-seed disturbed area with wildflower seed…
The Fair will be arriving on Monday 19 November and be open to the public over the period 24 October until 1 November from early afternoon until 10pm in the evening
On Wednesday 22 January London Universities and Colleges Athletics will be holding their annual run on the Common
Arthurs Pond has been managed to allow a dense barrier of scrub woodland to develop on its roadside edges. This was in direct response to multiple incidents of fly-tipping in the body of the pond in the 1990s and before. This enhancement proposal will consider tree and shrub growth. Comments are welcome, please download the…