Commonside East Informal Pedestrian Crossing
The Conservators have agreed to the construction of a new raised informal pedestrian crossing to the Common. Further details are provided at the link below
TOP BANNER (DON’T CHANGE THIS TITLE)
CURRENT PROJECTS, MEETINGS & EVENTS SLBI Guided Walk Saturday 28th October 2024 Grassland Ecology SLBI Guided Walks Tuesday 22nd October and Tuesday 12th November Fungi Foray Work Programme -Autumn 2024 Works Programme – Autumn 2024 SGN Gas Pipeline Replacement SGN Gas Pipeline Replacement Work Programme – Summer 2024 Work Schedule- Summer 2024 Conservators Seeking Donations…
Public Space Protection Order (PSPO) Consultation
Merton currently operates existing dog control orders, but they expire soon and we are looking to seek further public views via an online consultation, details of which have been drawn up based on feedback and experience from our legal team and communications. • https://www.merton.gov.uk/communities-and-neighbourhoods/dog-control-orders – Details on existing dog related PSPO’s • https://consult.merton.gov.uk/kms/elab.aspx?noip=1&CampaignId=824&CampaignStepTestId=-1&CampaignStepQuestionTestId=-1&CampaignUserRole=test – Consultation…
Conservators’ Meeting 11th March 2020
MCC Minutes 11.3.20
Croydon Rd Shared Path
On 18th January 2016 Merton Council will commence work on a shared-use (pedestrians and cyclists) path alongside Croydon Road between Carshalton Road and the Borough boundary with Croydon. The works are funded by TfL and scheduled to last a maximum of 27 weeks. The path will be 3 metres wide and will run parallel to the carriageway…
Footpath repair
Various footpaths over the Common are undergoing repair at the moment. Many footpath areas suffer during the winter months with all the rain and heavy traffic, leaving them boggy and awkward to use. Therefore stretches of footpath on 7. islands, 1. island and Mill House sites are all undergoing repair.